英语翻译If the vessel sailed on 01/01/2012,the vessel should l be arrived at Port Klang via tomorrow.Please take note,any charges incurred if any,due to late receive of the shipping documents for clearance purpose will be charged to your company.

来源:学生作业帮助网 编辑:作业帮 时间:2024/05/07 03:02:23

英语翻译If the vessel sailed on 01/01/2012,the vessel should l be arrived at Port Klang via tomorrow.Please take note,any charges incurred if any,due to late receive of the shipping documents for clearance purpose will be charged to your company.
英语翻译
If the vessel sailed on 01/01/2012,the vessel should l be arrived at Port Klang via tomorrow.
Please take note,any charges incurred if any,due to late receive of the shipping documents for clearance purpose will be charged to your company.
Therefore,please forward the shipping documents AS SOON AS POSSIBLE.
As usual ,please scan first the original sets.For FORM E,please scan both sides.

英语翻译If the vessel sailed on 01/01/2012,the vessel should l be arrived at Port Klang via tomorrow.Please take note,any charges incurred if any,due to late receive of the shipping documents for clearance purpose will be charged to your company.
如果该船于2012年1月1日启航,2012/1/1,该船将在明天抵达巴生港(位于马来西亚).
请注意:任何船务文件因延迟报关而衍生的款项将由贵公司承担.故此,请尽早发送船务文件.
一如以往,请先扫瞄文件正本.请双面扫瞄表格E.

英语翻译1.IF MULTIMODAL TRANSPORT DOCUMENT IS PRESENTED ,IT MUST SHOW AN ON BOARD VESSEL NOTATION INDICATION THE DATE,THE OCEAN VESSEL'S NAME AND PORT OF LOADING.2.INSURANCE POLICY OR CERTIFICATE OR DECLARATION IN TWO NEGOTIABLE FORMS INDICATING 英语翻译其中“loaded on board the vessel”怎么翻译? 英语翻译If the vessel sailed on 01/01/2012,the vessel should l be arrived at Port Klang via tomorrow.Please take note,any charges incurred if any,due to late receive of the shipping documents for clearance purpose will be charged to your company. 英语翻译Pumping direction reversed:upward in centre of the vessel(along the axis ). 英语翻译Effective immdy,in case if a feeder vessel or mother vessel will be delayed 2 or more days fm the ETD originsentered into gbspo,and origin has already received notice fm carrier as attached sample,pls continue to forward it to yr IPOC so laden on board the vessel the departure of the vessel to open the departure of the vessel to open 英语翻译the rudder is to be held to avoid allowing the vessel's head in a turn . 英语翻译PLEASE SHOW THE NAME,ADDRESS/TEL NO.OF CARRYING VESSEL'S AGENT AT THE PORT OF DESTINATION 英语翻译1,THE NUMBER AND DATE OF THE OREDIT AND THE NAME OF OUR BANK MUST BE QUOTED ON ALL DRAFTS(IF REQUTRED)2,TRANSPORT DOCUMENTS MUST BE CLAUSED:WITHIN THE REPUBLIC OF CYPRUS,VESSEL SHALL CALL ON ITS CURRENT VOYAGE ONLY AT PORTS DESIGNATET 英语翻译This specification sets forth the requirements for a diesel motor powered bulk cargo vessel.The Builder of the vessel should perform all work and details connected therewith which may be required to design,construct,equip,outfit,test and 英语翻译是天于GMS家庭报警器的1 .- Programming remotely numbers to alert the SA-1168-GSM.2 .- Remove the SMS sent by cutting and repositioning of electricity.3 .- The GSM ship within the team kept coming.4 .- If your equipment SA-1168-GSM 英语翻译the company involves piping nature gas from the May filed floating production storage and offloading(FPSO) vessel to a plant.其中,invovles doing 指的是“参与做某事”那么,后面的vessel 既然都是管道运输(piping) 英语翻译Should the seller substitute the performing vessel,a vessel nomination to the Buyer will be sent,informing the details of vessel,ETA loading port and so on.Buyer should confirm its acceptance or rejection to the Seller within 1 days after 英语翻译In case of the withdrawal of any vessel from service the Principal’s obligation for payment of the agency fee in respect of such vessel shall continue for a period of one (1) month from the date the vessel is withdrawn from service and 英语翻译the seller can prove that the right goods have been delivered om board of the vessel by providing the buyer with the relevant shipping documents. 英语翻译--Should the vessel arrives at loading port earlier than laydays commencement waiting time for berth of the vessel is for the buyer’s account unless used in such case time for actual use to count.--Should the vessel arrives at loading p