Appendix B:Critical New Program Information
Prequalification for New Production Facilities
 Effective March 1,2013,Ethical Sourcing prequalification will be required for all newly disclosed facilities and facilities requested for reactivation for all retail markets.
 For a facility to be placed in Active status,the facility must complete an Ethical Sourcing audit and be rated Green or Yellow,and suppliers may not request the addition of an existing Orange rated facility to their matrices.
 Production in a facility that has not been prequalified will be deemed unauthorized subcontracting.
 Newly disclosed facilities will also be required to participate in mandatory training sessions provided by Walmart in order to remain active.
 All newly disclosed or reactivated production facilities must undergo a mandatory electric and building safety assessment (Bangladesh facilities-only).
Pre-Production Requirements
In advance of sourcing merchandise for Walmart,suppliers must ensure the following - Failure to do so will be deemed an act of Unauthorized Subcontracting:
All facilities are fully and accurately disclosed in Retail Link and the buyer is notified; (Retail Link > Site Map > S > Supplier Profile > Supplier Dashboard).In retail markets where Retail Link is not utilized,suppliers should contact their buyer for details on the disclosure process for the specific retail market;
Buyers must be made aware,by item number,the facility where an item will be manufactured;
All facilities must be Active in Retail Link;
All facilities must be associated with the supplier’s Retail Link ID;
 All facilities must be assessed with a Green or Yellow Ethical Sourcing audit rating

英语翻译Appendix B:Critical New Program Information Prequalification for New Production Facilities  Effective March 1,2013,Ethical Sourcing prequalification will be required for all newly disclosed facilities and facilities requested for
附录B:重要的新计划新生产设施的信息资格预审2013年3月1日起,将道德采购资格预审所需的所有新披露的要求激活所有零售市场的设施和设备.对于被放置在“活动”状态的设施,设备必须完成的道德采购审计和被评为绿色或黄色,供应商不得要求除了现有的橙色额定设施,其矩阵.生产设施尚未通过资格预审的,将被视为未经授权的分包.新披露的设施也将参与沃尔玛提供的强制性培训课程,以保持活跃.所有新披露或重新生产设施必须经过强制性的电力和建筑安全评估(孟加拉国设施).前提前为沃尔玛采购商品的生产要求,供应商必须确保以下 - 如果不这样做,将被视为未经授权的分包行为:所有设施全面,准确地披露者外,在零售环节,并通知买方;(零售环节>网站地图> S>公司简介>公司信息中心).在零售市场,零售环节没有被利用,供应商应与他们的买家的详细信息,披露过程中的具体零售市场;买家必须意识到,项目编号,将生产设施的项目;所有的设施必须是活跃在零售环节;所有设施必须与供应商的零售环节ID;所有设施必须进行评估,绿色或黄色的道德采购的审计评级

附录B:关键新项目信息为新生产设施的资格预审?有效2013年3月1日,道德采购资格预审会要求所有新公布的设施和设施要求的所有零售市场的重新激活。?为设施放置在活跃状态,设备必须完成一个道德采购审计和被评为绿色或黄色,供应商不得请求添加一个现有的橙色额定设备到他们的矩阵。?

提前预生产需求采购商品的沃尔玛,供应商必须确保以下的——如果不这么做,就会被视为一个行为:??的未经授权的...

全部展开

附录B:关键新项目信息为新生产设施的资格预审?有效2013年3月1日,道德采购资格预审会要求所有新公布的设施和设施要求的所有零售市场的重新激活。?为设施放置在活跃状态,设备必须完成一个道德采购审计和被评为绿色或黄色,供应商不得请求添加一个现有的橙色额定设备到他们的矩阵。?

提前预生产需求采购商品的沃尔玛,供应商必须确保以下的——如果不这么做,就会被视为一个行为:??的未经授权的分包商所有设施是完全和准确地披露在零售环节和买方通知;(零售链接> > >年代站点地图供应商介绍>供应商仪表板)。在零售市场,零售环节不是利用,供应商应联系买家的详细信息,在信息披露过程中特定的零售
  买家应该意识到,通过项目编号,一个项目的设备将制造;
  所有设施必须活跃在零售环节;
  所有设施必须与供应商相关的零售链接ID;
  所有设施必须被评估与绿色或黄色的道德采购审计评级

收起

英语翻译要求照一张Appendix B-photo照片,但不知道是那种照片啊, 英语翻译The Seller warrants that the Goods and Services shall conform to the technical specifications mentioned in Appendix 1 and the warranties for the Goods and Services shall be as set forth in Appendix 1 of this Contract.All the Goods shall b 英语翻译Appendix B:Critical New Program Information Prequalification for New Production Facilities  Effective March 1,2013,Ethical Sourcing prequalification will be required for all newly disclosed facilities and facilities requested for 英语翻译5,25,and 50 kg although dependent on product grade.For further information please see appendix He will be a useful ____ to the staff of the school. 选项: a、appendix b、attachment c、additiond、add critique如何分词根 是crit-ique,还是criti-que 英语翻译VI.Scope of Art.26.19 Art.26.1 does not directly and fully apply to all covered agreements listed in Appendix 1DSU,but,pursuant to its first sentence,only to those “where the provisions of Art.XXIII:1(b) GATT 1994 are applicable”.Most appendix用a 还是an 英语翻译MANUFACTURER MUST PROVIDE A CERTIFIED TEST REPORT TO PPC IN ACCORDANCE WITH THE APPLICABLE APPENDIX OF ESN0033 ON TWO (2) OF EVERY TWENTY-SEVEN (27) REELS 英语翻译SUPPLIER must provide Electrical BOM List and Accessories/Giftbox List (with price) according to the Appendix two weeks after PO Handset has been issued appendix D-quality management plan assessment checklist attachment appendix annex 区别请问attachment,appendix和annex之间有些什么区别啊? 英语翻译Subject to the terms of this Contract,Seller shall supply to the Buyer the equipment ( the Goods) and provide services (the Services) specified in Appendix 1 in compliance with all applicable laws and regulations,and in accordance wit 英语翻译GUTACHTEN MIT FERTIGUNGSUBERWACHUNG CERTIFICATE OF CONFORMITY WTH FACTORY SURVEILLANCEVDE Priif- und ZertifizierungsinstitutDiese Anlage gilt nur in Verbindung mil Blatl 1 des Gutachlens mil FertigungsúberwachUngThis Appendix is only val 英语翻译Any qualifications set out in “Appendix C – Qualifications” shall apply although we understand that in the case of any such qualifications you reserve the right to disregard this TENDER. 英语翻译Appendix A:Merchandise in Scope for Walmart Ethical Sourcing Audit Program  Any merchandise imported by a Walmart retail entity. Any merchandise sourced through Walmart Global Sourcing (WGS)  Any private label,lice 英语翻译shop drawing work is out of scope of thecontractor.however,if the fabrication drawings shownin appendix 8-4 as a sample are not sufficient for the contractor's fabricationwork,thecontractor shall consider the cost of further detail drawin 英语翻译Appendix 1:Exploration ProgramIntroductionThis is a revised cost estimate based on recent discovery,which may have a significant (positive) bearing on the resource estimates.It is premature at this stage to be very accurate before final d