求翻译,不要在线翻译,专业英语翻译在线的不准AbstractThis work applies fuzzy sets to integrating manufacturing/distribution planning decision (MDPD) problems with multi-product and multi-time period in supply chains by considering ti

来源:学生作业帮助网 编辑:作业帮 时间:2024/05/13 08:52:45

求翻译,不要在线翻译,专业英语翻译在线的不准AbstractThis work applies fuzzy sets to integrating manufacturing/distribution planning decision (MDPD) problems with multi-product and multi-time period in supply chains by considering ti
求翻译,不要在线翻译,专业英语翻译在线的不准
Abstract
This work applies fuzzy sets to integrating manufacturing/distribution planning decision (MDPD) problems with multi-product and multi-time period in supply chains by considering time value of money for each of the operating cost categories. The proposed fuzzy multi-objective linear programming model (FMOLP) attempts to simultaneously minimize total costs and total delivery time with reference to inventory levels, available machine capacity and labor levels at each source, as well as market demand and available warehouse space at each destination, and the constraint on total budget. An industrial case demonstrates the feasibility of applying the proposed
model to a realistic MDPD problem and several significant management implications are presented based on computational analysis and comparisons with the existing MDPD methods. The main advantage of the proposed model is that it presents a systematic framework that facilitates fuzzy decision-making for solving the multi-objective MDPD problems with multi-product and multi-time period in supply chains under an uncertain environment, enabling the decision maker to adjust the search direction during the solution procedure to obtain a preferred satisfactory solution.
_ 2008 Elsevier Ltd. All rights reserved.

求翻译,不要在线翻译,专业英语翻译在线的不准AbstractThis work applies fuzzy sets to integrating manufacturing/distribution planning decision (MDPD) problems with multi-product and multi-time period in supply chains by considering ti
文摘
这项工作应用模糊集整合制造/布局规划决策(MDPD)问题,多产品、多考虑在供应链时期货币时间价值营运成本为每一个类别.建议的模糊多目标线性规划模型(FMOLP)试图同时减少总成本和整个交货时间,参照库存水平,可利用的设备能力和劳动力水平,在每一个源,以及市场需求和可用的仓库空间在每个地点,制约的全部预算.工业病例示范了应用该的可行性
模型MDPD现实的几个重要管理问题,提出一种基于意义的比较和计算分析与现有的MDPD方法.其主要优势是,该数学模型,提出了一种模糊决策辅助系统框架为解决问题多目标MDPD多产品、多在供应链时期在不确定环境下,使决策者调整搜索方向,求解过程中获得优先的令人满意的解决方案.
_ 2008年有限公司.版权所有.

求翻译,不要在线翻译,专业英语翻译在线的不准AbstractThis work applies fuzzy sets to integrating manufacturing/distribution planning decision (MDPD) problems with multi-product and multi-time period in supply chains by considering ti 英语翻译要求翻译的专业,不要用在线有道什么的翻译工具或是在线翻译.1.冰雕系列:古典生活、富贵叶、珠联璧合、太阳花、品味人生、秋水伊人、虞美人、家和万事兴、发财树、金枝玉叶 英语翻译不要在线翻译的 英语翻译不要在线翻译的! 英语翻译不要在线翻译的, 英语翻译不要在线翻译的 英语翻译求英语高手翻译 请不要发来英语在线翻译的内容 英语翻译请不要用在线翻译工具来翻译,求最准确的答案! 英语翻译不要在线翻译的 最好是自己翻译的 英语翻译不要那种专门在在线翻译中翻译过来的! 英语翻译我不要什么有道 各种在线翻译网站翻译的 英语翻译要官方一点的那种翻译,不要在线翻译那种, 英语翻译不要像谷歌在线那样,翻译的全是语法错误.有没有翻译出来的句子质量好点的呢?最好不是在线翻译的那种. 英语翻译在线跪求英语强人帮忙翻译一篇900字左右的文章,汉译英,不要在线翻译软件,那个语法有问题.跪求强人专业翻译!明天中午前就要, 英语翻译求专业的翻译水准 英语翻译不要那种在线翻译的. 英语翻译不要在线翻译的那种 英语翻译不要网上在线翻译的!